Project

Bunut Rendang – 2016

Completed in 2018, this is a recovery projects under Jabatan Pengairan & Saliran (JPS) consists of 154 units bungalow houses, surau, open space area and facilities at fishermen resettlement at Bunut Rendang in Kuantan, Pahang. We provide full C&S and M&E services for this project.

Bukit Mentok – 2011

This project under ASM Dev. consists of developing 2184 units of houses and commercial area in Kemaman, Terengganu. SZY is the main consultant for both C&S and M&E for this project.

PRIMA Gambang – 2012

We are the main consultant for both C&S and M&E in developing approximately 1012 units of Semi-D houses in Gambang, Pahang.

Dewan Paya Besar – 2017

This project under Majlis Perbandaran Kuantan (MPK) is to build a main hall at Paya Besar, Kuantan Pahang. The size of the hall is of 1000mm or 10 badminton courts. We provide comprehensive C&S and M&E services for this project. This project is to be completed in 2020.

Stadium Hoki – 2011

Completed in 2012, we provided C&S services for the development of a new hockey stadium at Kompleks Belia & Sukan for SUKMA 2012 in Kuantan, Pahang. This project was under Majlis Perbandaran Kuantan (MPK).

Ancasa Royale Hotel – 2010

We are the main C&S consultant in designing a 4-star hotel in Pekan, Pahang. The seven-storey hotel with 133 rooms, has all the latest facilities including the main ballroom and several function rooms, swimming pool, gymnasium and spa. This project was completed in 2014.

UITM Solar – 2017

SZY is the main C&S Consultant in developing Solar Farm in Gambang, Pahang. The area for the development is approximately 200 acres and consists of Solar Farm, UITM research building & others.

Tebatan Banjir – 2013

Completed in 2016, this is one of Flood mitigation project under JPS in Kuantan, Pahang. SZY is the lead consultant in designing flood mitigation system at bandar Kuantan.

Jalan Kuantan – Pekan – 2005

SZY was tasked in designing of upgrading the federal road that connects Kuantan district and Pekan district by Jabatan Kerja Raya (JKR). This highway is approximately 35km in length. This project was completed in 2009.

TCB – 2016

SZY has been entrusted by Alliance Stell (M) Sdn Bhd to be their lead local consultant in designing the allignment for Tubular Conveyor Belt System in Gebeng Industry Park. The TCB system connects Kuantan Port and MCKIP is approximately 12km in length.

Boardwalk Tioman – 2014

Completed in 2017, this project is to build as an improvement for the mobility of local people in Kg Tekek, Tioman. This Boardwalk acts as an attraction for tourist that comes to the island. SZY was assigned by Tioman Development Authority (TDA) as the main C&S consultant.

BALB Pahang Zon 1 A&B Water Supply – 2010

SZY has been assigned by Pengurusan Air Pahang Berhad (PAIP) in designing water supply system for 5 district in (Kuala Lipis, Jerantut, Temerloh, Raub, Cameron Highland) in negeri Pahang. This project was completed in 2012.

KUIPSAS Auditorium 2015

This project from Jabatan Kerja Jaya (JKR) is to build a 500-seater auditorium for Kolej Universiti Islam Sultan Ahmad Shah (KUIPSAS) located in Kuantan, Pahang. SZY provided a comprehensive mechanical and electrical services until the project completed in 2018.

Piperack Facilities – 2015

This fast-track project is a feasibility study to determine the necessity of piperack facilities for about 30 industrial users at Gebeng, Kuantan Pahang. SZY had ventured with a team from University of Malaysia Pahang in studying the requirement and developing the alignment options which involved a number of Authorities and land acquisition. SZY had also developed detailed design for the 12km long piperack across Gebeng. The study and detailed design completed in 2016.

Bredero Shaw – 2016

SZY has been appointed by Bredero Shaw (M) Sdn Bhd to obtain legalization from the local Authority for its 120 numbers of existing building in the plant located in Gebeng, Pahang. SZY scope of works consists of redrawing the buildings, preparing for submissions and fulfilling the (CCC) from Majlis Perbandaran Kuantan (MPK). This involves both passive and active systems the buildings. The project is currently ongoing and has completed up to 80%.

Road Asset Management Services – 2013

SZY GIS team has been appointed by Yayasan Pahang Maintenance (YPM) to provide road asset management services. SZY scope of services include collecting data for inventory of the length and width of the state, village and agriculture roads in overall Pahang, as well as inventory of road assets. SZY binds a 7 year contract with YPM and it will end in April 2020.